Aggreko Rental Power For The Mining Industry
Aggreko
Rental Power For The Mining Industry
AGGREKO
: AN INTRODUCTION
Aggreko has more than 45 years of experience with
operations spanning across all continents of the globe and today is the largest
rental power generation services company in the world. With over 2,200 highly
skilled and experienced staff in more than 100 locations, Aggreko has the
capability to design and deliver tailor-made power solutions for the mining
industry.
Aggreko precisely understands the needs of the mining
industry. Increasingly called upon to provide power rental solutions for mining
projects around the world, we understand that no two mining projects are the
same. Through our experience we have gained invaluable knowledge to effectively
tailor the power solution to the specific requirements of your mining project
Aggreko owns and maintains the world's largest power
rental fleet, consisting of diesel and natural gas fired generating sets. We
can quickly install single or multi-megawatt capacity power plants at a project
site to serve various mining applications.
AGGREKO RENTAL POWER
GENERATION SERVICES INCLUDE
§ Rental
of Complete Range of Equipment
§ Power
Assessment and Power Plant Design
§ Preparation,
Testing, Mobilization and Transportation of Equipment
§ Installation
and Commissioning
§ Operation
and Maintenance
§ Decommissioning
and Demobilization
APPLICATIONS OF AGGREKO
RENTAL POWER SERVICES
§ Power
for mine construction
§ Power
for accommodation and support facilities
§ Remote
mine power where grid supply is unavailable or unreliable
§ Early
power before grid supply or main power plant is installed
§ Supplemental
power during upgrade/expansion of mine
§ Emergency
breakdown coverage
BENEFITS OF AGGREKO
RENTAL POWER SERVICES
§ Turnkey
Power Solution - Aggreko assumes total responsibility for design, installation,
commissioning, operation and maintenance of the power plant.
§ No
Capital Expenditure - Allows you to pay for power capacity as per your need.
Improves cashflow.
§ Reliability
- Aggreko equipment is designed for rental operation in harsh environments and
manufactured in-house to stringent ISO standards to ensure failproof operation.
§ Flexibility
- Modular 1MW power units allow increase/decrease in plant capacity in line
with load demand during the project.
§ Rapid
Deployment - Equipment housed in standard 20 ft. ISO containers for ease of transportation
by land, sea or air.
BENEFITS OF AGGREKO
RENTAL POWER SERVICES
TURNKEY POWER SOLUTION
At Aggreko, we don't merely supply power rental
equipment. We assume total responsibility for providing a turnkey solution
right from the design of the power plant to its operation and maintenance on-site
and finally decommissioning and transportation of the equipment at the end of
the contract.
Aggreko's turnkey approach allows you, the client, to
focus on your core operation - mining.
NO
CAPITAL EXPENDITURE - PAY AS YOU PRODUCE
Aggreko power solutions impact positively on the cash
flow of a mining project by providing an alternative to making up-front capital
expenditure in purchasing power equipment.
Renting
a power plant releases the miner from the costs and administration associated
with plant ownership. Furthermore, this arrangement enables the client to make
staged payments over the duration of the rental period that can be financed
from the sale of the commodity being mined.
“Within three weeks of
signing a contract the necessary equipment had been sourced, checked,
mobilized, installed and commissioned on the mine site. During six month
crisis, the power performed without fault and ensured continuous mine
production by supplementing the national grid.”
-David Ingle, General Manager, Abosso Goldfields
Limited
|
RELIABILITY
Over the years Aggreko has built a reputation as a
supplier of reliable and guaranteed power.
Aggreko generators are designed, assembled and tested
to stringent standards at the company's own ISO 9001:2000 accredited
manufacturing facility in the UK. Aggreko equipment is designed to operate in
harsh environments and in extreme climatic conditions -from very high ambient
to sub zero temperatures.
Based on the site, the Aggreko service and maintenance
staff provide round-the-clock
supervision to ensure the power plant operates at peak performance, delivering
a guaranteed power supply.
FLEXIBILITY
Aggreko power solutions come with the flexibility to accommodate
the fluctuation in power requirement over the life cycle of a mining project.
The modular design of Aggreko power plant utilizes synchronized base 1 MW units
to build the required multi-MW capacity. During the course of the project, if the
demand increases or decreases we can add or take away the generating capacity
as required.
RAPID DEPLOYMENT
Aggreko power plants can be operational on-site within
a matter of days from the date of signing a contract.
With full control over the world's largest rental
fleet located in strategic locations around the world, Aggreko is able to
mobilize, transport, install and commission the power plant within very short
timescales. Aggreko equipment is housed in standard 20 ft. ISO seaworthy
containers that facilitates ease of handling and transportation by sea, land or
air.
CASE
STUDIES
POWER FOR MINE CONSTRUCTION
The client was constructing what was to become the
second largest copper and gold mine in the world. The site was located ni the
middle of the Gobi Desert, one of the most remote places on earth with an
extremely harsh climate. With no utility power available for the first years of
development, the client would need temporary power to begin sinking the shaft
to facilitate underground mining.
“We were extremely
impressed with the rapid, professional response received from Aggreko.
Within six weeks of contract effectiveness the necessary equipment had been
mobilized, installed and commissioned on site ensuring a continuous power
supply. At all times, Aggreko personnel demonstrated a thorough grasp of
the urgency and critical nature of our needs and acted accordingly.”
-Francis Gbeddy, AG, Director, Ministry of Mines
& Energy, Ghana
|
EARLY POWER BEFORE AVAILABILITY OF LOCAL GRID
The client was unable to begin mining operations at a
remote gold mine in Guatemala as construction of the grid line that was to
power the mine was indefinitely delayed. Aggreko was asked to provide a quick
solutions so that production at the mine could begin without any further delay.
“Aggreko were only too happy to help us and gave good
advice on what to use and why. Our requirements were met to complete
satisfaction.”
- John Watson Contract manager, Norilsk Nickel,
Australia
|
POWER FOR STAFF ACCOMODATIONN AND ESSENTIAL FACILITIES
Power was required for operations at a mine situated
at an altitude of 4,400 meters in the Andes mountains. As well as the main
mining operations, a reliable power supply was also required to ensure that
more than 400 resident workers, housed in a base camp, were comfortable during
the freezing conditions in winter.
Aggreko supplied an 8MW / 11 kV power package
including operation and maintenance personnel to ensure 100% power availability
to support mining activities and provide safety and comfort to the workers
living there.
POWER FOR REMOTE MINE WHERE GRID IS UNAVAILABLE
Often mines are located in isolated areas where there
is no grid connection or where it is too expensive to install a power line.
Power was required for one such mine in Ghana, the
Damang gold mine owned by Abosso Goldfields. Aggreko's capability to deliver
power solutions in remote areas was well known to the customer. Within three
weeks of signing the contract, the necessary equipment was mobilized,
transported, installed and commissioned on site.
POWER FOR EMERGENCY/BREAKDOWN COVERAGE
Operated by Ashanti Goldfields in Guinea, the Siguiri
gold mine had a problem when the mine's on-site generators broke down. The
mining operations came to a halt as there was no other reliable source of power
that could be made available quickly. Aggreko was contacted in this dire
situation to provide a solution.
Aggreko responded by air freighting a 3.2MVA power
package within 3 days from receiving the initial call from the customer. The
equipment was delivered to the airport at Conakry (the capital of Guinea) and
then transported some 550 kilometers by road to the mine site in north-east
Guinea. Aggreko personnel then installed and commissioned the power plant
ensuring minimal downtime. The mine was back in business within a week of the
SOS call to Aggreko.
POWER FOR MINE EXPANSION
The Sunrise Dam gold mine in Western Australia, owned
by Anglo American needed an upgrade of its process mill as part of the mine
expansion activities. Additional baseload power was needed on a short term
basis to cater for the increased processing capacity.
Aggreko installed a 4.BMW I 6.6kV temporary power
station that fed directly into the "Bus-Bar" of the main power plant
to meet the short term rise in power demand. The power package comprised of 6 x
1250kVA diesel generators, 1.3 km length of LV cables and service engineers to
maintain and operate the equipment.
“Aggreko are very professional and set their standard
very high. The services they provide is always of the highest level.”
- Mike Owen, services Engineer, Xstrata Coal, Australia
|
AGGREKO PEOPLE
The fact that Aggreko enjoys such an enviable
reputation in the marketplace is largely due to the skill, experience and
competence of the people who work at Aggreko. Not only do we provide our
customers with specialized rental equipment, we also help engineer and design
integrated solutions to meet the exacting needs of our customers.
Aggreko engineering teams will work alongside your
engineers to specify the most reliable and cost effective solution to your
power needs. The Aggreko team will mobilize, test, dispatch and install all the
equipment required in the shortest time possible. Throughout the project our
specialist project managers and technicians will operate and maintain the
equipment at peak performance. Our engineers will interface with you regularly
to ensure we deliver seamless power on a 24/7 basis.
AGGREKO
EQUIPMENT
1.
AGGREKO
GENERATORS
§ Diesel
or natural gas powered.
§ Dual
frequency capable 50Hz or 60Hz.
§ Suitable
for high or low ambient temperature and harsh environments.
§ Sound
attenuated enclosure.
§ Save
ALL containment base – Prevents spillage of fluids or fuel and eliminates need
for temporary bunds.
2. FUEL
TANKS
§ Flexible
fuel storage capacities to meet the client’s requirement.
§ Environmentally
safe tanks – Double wall construction.
§ Containerized
or cylindrical design with drip day
3.
FUEL
SKID
§ Fuel
unloading and transfer of fuel to bulk
storage tanks.
§ Include
high accuracy fuel flow metering.
4.
HIGH
VOLTAGE POWER TRANSFORMER
§ Manufactured and
tested to meet or exceed IEEE.
§ NEMA
and ANSI standards.
§ UL
1562 listed.
§ Multi-tap,
multi-voltage for range of common utility voltages from 3.3kV to 15kV self
contained modules with switchgear and build-in protection.
5. SPARES
CONTAINERS
§
A
comprehensive stocks of spare parts and consumable are always available at
sites.
6.
CONTROL
AND METERING
§ Microprocessor
based generator set metering, monitoring and control system including automatic
synchronization with KW and PF control in parallel mode.
SPECIALIST
SERVICES
QUALITY, HEALTH, SAFETY AND ENVIRONMENT (QHSE)
The scope of Aggreko service goes beyond just
providing reliable power solutions. Above all, Aggreko values quality and
safety for every project that we undertake. Stringent quality processes are
applied to comply with the best operating practices in the industry. Aggreko
not only operates to its own quality standards but also adheres to the local
environmental and safety regulations as applicable to Aggreko's nature of
services.
AS A STANDARD :
§ All
Aggreko processes are ISO 9001 :2001 compliant
§ QHSE
system is implemented at all sites
§ Environmental,
Health and Safety (EH&S) kits delivered to every site
§ EH&S
training is provided for our own staff and local employees in
·
Basic first aid
·
Fire fighting
·
Crane and forklift operation
·
High voltage operation
·
Defensive driving
§ Periodic
audits are carried out by trained auditors and actions are completed within agreed
time frame.
§ EH&S
Key Performance Indicators (KPIs) monitored and reported periodically to the Aggreko
Senior Management
FUEL MANAGEMENT
Along
with the power generation equipment, Aggreko can also supply large fuel storage
tanks to facilitate storage of fuel on site. All fuel tanks are fully bunded
and pressure tested to prevent the risk of spillage.
To
monitor and control the quality and quantity of fuel, Aggreko can also supply:
§ Fuel
filtration system
§ High
accuracy fuel flow meters
§ Winterization
packages with trace heating systems.
TEMPERATURE CONTROL SERVICES
In addition to power generation, Aggreko also offers a
range of specialist temperature control and cooling rental solutions for the
mining industry. Applications include ventilation of underground mines, process
cooling and decreasing downtime during scheduled maintenance shutdowns. Please
contact us for more information about our temperature control services.
Hubungi Kami:
CV Akhaya Cemerlang
Ruko Manalagi Blok C, Jl. Raja Alikelana No.10, Belian, Batam Kota 29464
Telp : +62778475467
HP : +6282288303338
HP : +6285883600151
WA : +6282173332233 (Fandy Iood)
#Supplier #Distributor #Seller #factory #Industry #Buyer #Manafucture
CV Akhaya Cemerlang
Ruko Manalagi Blok C, Jl. Raja Alikelana No.10, Belian, Batam Kota 29464
Telp : +62778475467
HP : +6282288303338
HP : +6285883600151
WA : +6282173332233 (Fandy Iood)
#Supplier #Distributor #Seller #factory #Industry #Buyer #Manafucture
Komentar
Posting Komentar