ARP ENERGY Indonesia | Grid Stability
ARP ENERGY
Indonesia | Grid Stability
Background
When it comes to power generation, fuel represents one
of the highest operating costs, particularly diesel fuel. In Indonesia, PLN,
the state-owned utility, required a more fuel-efficient solution than what was
being provided by its former solutions provider. The need was for a 40MW plant
to supply power to the capital city of West Sumatra, Padang. With the youngest,
most advanced fleet in the industry, APR Energy was uniquely positioned with
the most fuel-efficient technology available in the fast-track power market
today to help PLN reduce its fuel costs.
Challenge
The customer was very concerned about power disruption
during transition to APR Energy’s power plant. To alleviate this concern and
minimize any downtime in power production, APR Energy worked with PLN to identify
alternative plant locations whilst also coordinating with the previous provider
during demobilization of its plant on the existing site. Additionally, the
customer’s feeders could only handle a maximum of 20MW, so APR Energy’s
engineering team had to ensure that the new plant designs functioned within
these parameters. Shortly after commencing the project the customer lost one of
its own gas turbines, further adding to the immediate power need.
Solution
APR Energy provided Diesel Power Modules form its
Asian hub Strategically located in Malaysia. This product, an industry leader
in terms of fuel efficiency, reliability, and emissions control, combined with
APR Energy’s comprehensive operation and maintenance expertise to ensure a
reliable and efficient supply of electricity to the customer. APR Energy’s
flexibility to meet PLN’s needs allowed APR Energy to offer a phased delivery
of 15MW, 20MW, and 5MW blocks in parallel with the former solution provider’s
demobilization of the existing site.
Outcome
Not only did PLN experience a smooth transition during
the installation of the APR Energy equipment, but it will also save
substantially on fuel costs using the state of the art equipment and
technology. APR Energy will continue to support and improve its plant
performance throughout the contract term by conducting on going reviews of its
operations and fuel efficiency. Further APR Energy Supported the local
community by hiring and training more than 30 local workers for the plant.
Call us / Hubungi kami :
PT. OODS ERA MANDIRI
Alamat : Ruko Manalagi Blok C no 10, Batam Kota,
29464, Kepulauan Riau, Indonesia
Telp : 0778-475-467
Sales Number :
082173332233
082288303338
085836000151
Website : www.oodsgroup.com
Komentar
Posting Komentar